Able Tech (huizhou)Industries Ltd.
Home Abou Us Products Capacity News Contact Us 简体中文|日本语|Engilsh
 
Quality Control



 Policy     
To make good products (parts is finished parts) is our first priority.quality first

 Action Guideline   

Our guideline: A,B defect will be improved completely, change person, change project, and improve management.

.
 steps of quality improvement
 Regarding to make A,B defect, we will improve it find solution on same day.
Within three days,send quality improved report to clients.
To strengthen our ability to adapt all defective changes happening now and to avoid it happens in the future.
Continuous educating our QC people with the knowledge,guidance and consciousness of quality issue.
  

 
16 prior to manufacturing quality should be fully implemented.
 Production preparation stage
 Manufacturing standards of preparation (QC engineering table, ISC, operating standards book, reference book packaging) to complete.
 Manufacturing (forming, coating, assembly, etc.) conditions are established mass production.
 New job, the job of the operator to implement the guidance, education, understanding, after the operation.
 Point inspection before the start of a day operations equipment, fixtures.
 Mold, after passing the transfer to the forming section (create a complete transfer of management).
 Coating thickness changes according to implementation of quality confirmation (color, intensity).
 Manufacturing, quality stakeholders, to understand the quality requirements of the content.
 Forming under the conditions change, verify that the product changes (burr, contraction, coating condition)
.

 Production stage
 Management to fully implement the initial flow (~ production operations - packaging materials).
 To confirm the operation before the start of the book and check the standard reference work.
 Immediately report abnormal boss.
 Changes to create the conditions to all "4M change." After recognition of operation.
 Quality to the base "base book, limit the sample" to judge.

 Every day every day to deal with the bad and improve implementation.

Thoroughly bad logo, LOT management.

  the management of injection machine need fully. (ex: screw, heat)


Webmap|Contact Us|About Us
All © copyright 1999-2011 Able Tech (huizhou)Industries Ltd. All rights reserved.